While I was in California visiting family the final permit was approved! The demolition is going strong now. All the drywall, wiring and plumbing have been torn out. Most of the siding is off and today the roof is going away! In the basement the plumbers cut up some of the floor to check the pipes finding that the main drain to the septic was old and crumbling. So, tack on some more money and let’s tear it all up and replace the whole thing!
I am starting to feel a bit like were in the money pit. We knew we’d find surprises that needed fixing or repair, but some of what we found when we pulled off the drywall was downright scary. For example, the front entry and guest bathroom were built over what used to be a deck. Literally they built right on the deck and just closed things in to look like it was properly framed, supported, insulated and finished space. No wonder that area was always so cold ;).
We also found some rotten areas behind the old showers, so in the long run I’m glad we pulled them out as well. Every fixture, wall, wire, pipe will be new in the house. Not to mention all insulation. That all actually gives me a sense of comfort, albeit at a pretty big price.
Tim and I went through the plans again and made some adjustments in the basement. Boulder County is requiring us to widen the hallway down there to bring it to code which means we had to completely gut the bathroom we installed this summer! Looking on the bright side, I will get a larger master bathroom!
After talking everything through this weekend (with much wine) Tim and I agree on the whole demolition process. While demo is fun and it shows so much progress and immediate satisfaction, it also opens up the problems lurking within, and stretches the bank. Budget? Ha, that house just laughed at our budget!